SCADA/IIOT Industrial 3G 4G Cellular Router For Industrial Automation

Time:2018-06-07 Source:

Xiamen Caimore’s DTU for Industrial Control


1.Challenge:
Industrial control field is usually under bad environment with serious disturbance like high temperature, humidity, vibration, power grid. Especially in electromagnetic and radio interference environment, we need electromagnetic shielding and physical protection of circuit for continuous, reliable, complete data transmission in a long time; in some industrial environments, such as moving or rotating equipment, the routing is very inconvenient.
2 . The solution :
In order to solve these problems, We caimore comes up with a solution for the trouble of data transmission under bad environment, by using a set of GPRS DTU wireless data transmission technology instead of cable control in the industrial control field. This solution uses the Internet server to do remote control with wireless network, it is not restricted by distance and networking architecture.
3 . Why Caimore :
Caimore had devoted themselves in SCADA/IOT/M2M for more than 13 years . Mainly deal in MNVR/MDVR/Bus wifi router with VOD function for advertisement pushing / Industrial router with and without wifi/RTU/DTU(IP can.)/SMS modem etc.
Products with 2G/3G/4G network type are available . Also different cellular for different requirements .
Caimore products builds rugged, reliable devices that can do their jobs in tough environments. And we get your data where it needs to go, whether it’s via wired connections, wireless connections or one of the many possible combinations of the two.Also there are many parents and qualifications in our side . We can provide you a competitive and useful solution.

Features for our DTU :
(1) The reliability of communication--the communication system need to withstand the harsh environment of long-term and strong electromagnetic interference or noise, and to maintain the smooth flow of communication. (2) Construction costs--it need to consider the construction cost, long-term using and maintenance cost in meeting the reliability of premise.
(3) Bi-directional communication --it is not only to achieve the amount of information uploaded, but also to achieve a controlled amount of release.
(4) Multi-service data transfer rate--with the growing volume of terminal business in future, the communication between the master station and the sub-station or sub-station to the terminal communication, will have a high request on multi-service data transfer rates
(5) Communication flexibility and scalability--due to the characteristics of multi-surface control point, wide and dispersed surface, charging pile will use a standard communication protocol. With the growing business of electric power operation and “ALL IP” network technology’s development, IP-based services need to be considered bearer, and also require to facilitate the installation and construction, commissioning, operation and maintenance.